Shenyang ABT Drilling Equipment Co., Ltd.

Matters Needing Attention in the Process of Drilling Well Well Drill

In fact, the drill bit plays a pivotal role in the process of water well drilling rigs, and the quality of a drill bit directly affects the efficiency and hole quality of the water well drilling rig, so we all need the choice and use of the drill bit. During the drilling process, the operator must pay attention to the use of the drill bit, so that the drill bit of the water well drilling rig can work better, and everyone should pay more attention to some aspects of the drill bit.


1. After the drill bit of the water well drilling rig machine is drilled into the structure, the center drilling tool needs to be replaced in time. First, the bottom of the hole needs to be cleaned, and then the residue at the bottom of the hole is blown clean. The tool is slowly lifted up, and it is most suitable when the lifting force is just enough to lift the drill tool.


2. The drill bit of the water well drilling rig machine is summarized during the drilling process. It is also necessary to pay careful attention to the follow-up situation of the casing, to understand the specific situation in the hole in time, and keep the hole clean in time when necessary, and the drill bit in the water well drilling rig machine is on the drilling rig. During the process, strong lifting is prohibited.

 

3. Sometimes there will be more residual slag at the bottom of the hole of the water well drilling rig. The rotating part of the eccentric drill bit will be blocked by the slag, which will affect its gathering production. At this time, it is necessary to deliver compressed air and clean the hole again. And make the down-the-hole hammer work for a short period of time, and then resume the lifting operation of the center drill.

Related News
CONTACT
Tel:+86-13889196063
Add:No. 95-2, blacksmith Road, Hunnan District, Shenyang, Liaoning